A Year of Projects 2015, Week 26.5

come-blog_0

For the past week, I’ve been crafting like it’s my job.  I also had an unusually high number of fun activities.  I had lunch in Diagon Alley with Ravelry friends who were in Orlando on vacation from Massachusetts.

image
Of all the items listed for sale here, I most want the never-tangle wool.

I went to my first ever professional soccer game.  It was my cousin’s wife’s birthday and that’s what she wanted to do.

image

My husband and I bought tickets to view last Sunday’s SpaceX Falcon 9 launch from the NASA causeway.  We didn’t want to get up at the crack of dawn and drive over, so we drove over Saturday night and stayed in a hotel.

image
If you look closely, you can see Launch Pad 40 and maybe the rocket on the pad. There’s 4 objects that look like buildings. Pad 40 is between the two right hand buildings. There’s 4 lightning towers surrounding the pad; the rocket is in the middle.  It’s a slightly thicker line than the 4 surrounding towers.

Here’s the video I took of the launch.  The vehicle failed 139 seconds after launch.  I stopped recording two seconds before that because I was using my phone to record video and could barely see anything at that point.  It looked like a beautiful, perfect launch with nothing more to see.  And then the Liquid Oxygen tank exploded.

I still managed to get quite a bit of crafting done!  Let’s review the ridiculously ambitious list of goals I wrote:

Goals for June 21 to 30, 2015

  • Finish Raindrops on Roses Shawl (Headmistress Challenge)
  • Finish Grisou Scarf (homework, but which class?)
  • Finish Solid / 1×1 Scarf (OWL)
  • Three more color and weave scarves to meet OWL 50% (highly unlikely to finish)
  • Finish current Heart Illusion Dishcloth, plus 4 more (COMC?)
  • Tier Scarf (Charms or Potions)
  • Crochet Dishcloths (Transfiguration)
  • MHK1 swatches (Divination and / or Charms)
  • Small stuffed bird (DADA)
  • Cast on Sweet Summer Shawl (Quidditch Round 3; due July 8)
  • Liquid Silver Swatch (OOTP; due July 19)
  • Cast on Begonia Swirl Shawl (Headmistress Challenge; due July 28)

Fully Accomplished Goals

I finished the Raindrops on Roses Shawl.  I absolutely love it.  I test knit this for Assorted Musings (Ravelry, blog); the pattern will be released on July 15.  I plan to publish a detailed blog post for FO Friday on July 3.

image

I finished the Grisou Scarf.  I test knit this for Sasoolero (Ravelry, blog) and I’m not sure when she plans to release the pattern.  I will publish a blog post on this project for FO Friday on July 3.

IMG_9439

Partially Accomplished Goals

I started the Solid / 1×1 Scarf.  I’ve woven somewhere between 1/3 and 1/2 of it.  I have the hardest time taking pictures of weaving in progress.  Since the finished work gets wound onto the cloth beam, it’s difficult to see progress!

image

I finished the Heart Illusion Dishcloth that I had in progress, plus two more.

image

I started the tier scarf and knit about 1/3 of it.

Knitting while waiting for the rocket launch.
Knitting while waiting for the rocket launch.

I crocheted one dishcloth.  In my goal, I didn’t say how many I wanted to knit.  I need 18 for the Dishcloth Advent Calendar, but didn’t expect to get them all done this month.  I was hoping for 9.  I learned how to single crochet increase, single crochet decrease, and crochet through the back loop.

I knit the first 3 swatches for MHK1.  I still need to weave in the ends and block them.  I also wrote answers to several more questions.

image

Unaccomplished Goals

As expected, I did not weave the 3 additional scarves for my OWL.  I did not make the stuffed bird.  I decided to submit the Grisou scarf for DADA instead, and didn’t need the bird for anything else.  I have not cast on the Sweet Summer Shawl.  I will be doing that today.  I have not swatched for Liquid Silver.  I will be doing that today.  I have not cast on Begonia Swirl Shawl.  I think I’m going to wait a couple of weeks and cast on before I go to TKGA in San Diego.  It will make excellent travel knitting.

Other Projects

I made a felted cat bed for Tiger.  I managed to knit 1,047 yards worth of garter stitch in less than 3 days, felt it, and stitch it together!  It wasn’t on my goal list because I hadn’t decided to do it until after I wrote that list.  Tiger’s been sleeping on an alpaca blanket my father bought me when he was in Peru and I didn’t want it ruined.  I needed a quick replacement.

image

Goals for July 1 to 5, 2015

  • Knit at least 1/2 of the Sweet Summer Shawl
  • Cast on Miranda Shawl
  • Swatch and Cast on Bubbles Baby Blanket
  • Swatch and Cast on Liquid Silver Shawl
  • Finish spinning and plying the Cormo I’ve been working on since February
  • Start spinning the 3 Feet of Sheep (8 ounces BFL) on July 4 for Tour de Fleece

I’m tempted to write more, but I think this is more than enough.  My husband is off on Friday and Monday for the July 4 holiday.  I will have less crafting time than usual because I’ll be hanging out with him, and we’re going to the beach for at least one day!

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
    • First 3 swatches finished by June 24, 2015
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Grisou Scarf, finished June 24, 2015
    • Raindrops on Roses Shawlette, finished June 27, 2015
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar
    • Diagonal Crochet Dishcloths (in progress)

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

A Year of Projects 2015, Week 25

It’s been a busy week around here, and this coming week will be busy too.  However, there’s always time to craft!

come-blog_0

Here’s the list of goals I wrote last week:

Goals for the Week of June 14 – 20, 2015

  • Finish the Sand Tracks Scarf.
  • Finish the Raindrops on Roses Shawlette.
  • Finish half of the questions and swatches for MHK1.
  • Finish at least one color and weave scarf on the rigid heddle loom.
  • Cast on the Liquid Silver Shawl.
  • Knit the Grisou Scarf (another test knit).

I’ve finished the Sand Tracks Scarf.

image

The Raindrops on Roses Shawlette is a stockinette stitch body with three repeats of a lace pattern.  I finished that, but did not bind off.  I have enough yarn to knit at least one, possibly two, more repeats of the lace.  Since this is a test knit, I e-mailed the designer and asked if she preferred that I bind off now, per the pattern, or if it was okay for me to knit extra repeats.  She said she’d like to see the shawl in a larger size, so I’m going to knit the additional repeats and expect to finish early this week.  Here’s how it looked on Wednesday, 4 rows shy of finishing the first three lace repeats:

image

I haven’t done anything with MHK1 this week.  I need to make this a priority as I want to finish before I go to TKGA’s Annual Conference in San Diego from July 21-26.

Yesterday, I tied on a color and weave scarf.  This is a solid red warp.  The weft alternates one pick of the same red as the warp with one pick of a tweed.  I’ve woven perhaps 1/4 of the scarf, and plan to finish it early this week.

image

I looked at all the crafting I plan to finish this month and decided to move Liquid Silver to early July.  I do want to swatch for it by the end of the month.

The Grisou Scarf is a test knit.  I am using a different yarn than the designer, so swatched for it.  I ended up knitting swatches with three different size needles!  I’ve just got to finish the border, and expect to finish knitting it today.

image

While I was waiting to hear back from the designer of Raindrops on Roses and for the Grisou swatches to dry, I cast on another Heart Illusion Dishcloth.  I got about 1/2 of it knit.

image

Finally, though this has nothing to do with knitting, I wanted to post a picture of me with my father, since today is Father’s Day in the United States.  I often say that I’ve birdwatched since I was 6 months old.  My father started birdwatching shortly after my parents married, and once I came along, I was in a backpack on his back.  This morning, my father, mother, aunt, uncle, and I went birdwatching for Father’s Day.  We went to a newly opened 11 mile drive that skirts along the northern edge of Lake Apopka, not far from where we live.  We only saw 22 species of birds, all of which are common in our area, but we saw many, many individual birds of most species.  Here’s a picture my mom took of my Dad and I, looking at birds:

image

Goals for June 21 to 30, 2015

I’m writing this set of goals through the end of the month, to cover the class deadlines for the HPKCHC.  I honestly don’t expect to finish all of these items, but I’m going to do my best!

  • Finish Raindrops on Roses Shawl (Headmistress Challenge)
  • Finish Grisou Scarf (homework, but which class?)
  • Finish Solid / 1×1 Scarf (OWL)
  • Three more color and weave scarves to meet OWL 50% (highly unlikely to finish)
  • Finish current Heart Illusion Dishcloth, plus 4 more (COMC?)
  • Tier Scarf (Charms or Potions)
  • Crochet Dishcloths (Transfiguration)
  • MHK1 swatches (Divination and / or Charms)
  • Small stuffed bird (DADA)
  • Cast on Sweet Summer Shawl (Quidditch Round 3; due July 8)
  • Liquid Silver Swatch (OOTP; due July 19)
  • Cast on Begonia Swirl Shawl (Headmistress Challenge; due July 28)

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Raindrops on Roses Shawlette (in progress)
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

WIP Wednesday: June 3, 2015

I’ve gotten a lot of crafting done this week!

Cormo

Last Friday, I spent several hours spinning the Cormo while at a demo.  I started a new bobbin at the beginning of the event.  Here’s how it looked at the end of the event:

image

Heart Illusion Dishcloths

I’ve knit four more dishcloths this week.

image

Raindrops on Roses Shawl

I joined the Testing Pool group on Ravelry and signed up to do two test knits.  This is one of them.  It’s a top down shawl, stockinette with a lace border.  I’ve finished perhaps 1/4 of the stockinette section.

image

Sand Tracks Scarf

This is the second test knit.  It is a cabled scarf on a seed stitch background.  I’ve finished the garter stitch border and the first pattern repeat.  I think I’m really going to love this project.

image

May 2015 in Review

Since I haven’t posted in a couple of weeks, I thought I’d write a quick post re: finished projects and activities.

Finished Projects

Slytherin Houndstooth Scarf

  • Draft: Houndstooth
  • Loom: 15″ Cricket Table Top Loom
  • Reed: 10 dent
  • Warp Stats
    • Yarn: 150 yards (including loom waste) of  Knit Picks Capretta in Platinum and 150 yards (including loom waste) of Cascade Heritage Silk in Pine
    • Loom waste: 31 yards
    • Total Warp Ends: 110
    • Ends Per Inch (EPI): 10
    • Warp Length: 100″
  • Weft Stats
    • Yarn: 153.6 yards Knit Picks Capretta in Platinum and 142.8 yards Cascade Heritage Silk in Pine
    • Picks Per Inch (PPI): 10 – 12
    • Width in the Reed: 11″
  • Ravelry Project Page

I didn’t write a post about finishing this scarf, though it’s appeared in several WIP Wednesday posts (January 22, February 4, March 25).  I had to finish it so that I could weave the Dr. Who scarf on my rigid heddle loom!  Since this is the fourth Houndstooth Scarf I finished (see the posts on Gryffindor, Hufflepuff, and Ravenclaw Houndstooth scarves), I felt like I didn’t necessarily learn anything new on this project.  I did apply the lessons learned on the prior Houndstooth scarves, so the Slytherin is the most consistent of the four.

image
image

Cotton Candy Corriedale

  • Wheel: Kromski Fantasia
  • Spinning Twist: S (clockwise)
  • Plying Twist: Z (counter-clockwise)
  • Ratio: 8:1
  • Singles Yardage: 978 yards
  • Fiber: Sassy Bee Corriedale in Cotton Candy
  • Finished skein:
    • Ply Structure: 420 yards 2-ply; 46 yards n-ply
    • Weight: 4 oz
  • Ravelry Stash page

This is another project that I’ve been working on for a while and which has appeared in a couple of WIP Wednesday posts (February 4, February 18).  As of February 18, I’d finished plying and had wound most of the yarn onto a niddy noddy.  It then sat around, still on the niddy noddy, awaiting washing.

image

Dr. Who Scarf

I did write a blog post about this one!

image

Felted Cat Bed

  • Pattern: garter stitch
  • Yarn: 440 yards Patons SWS in Geranium
  • Needles: US 13 / 9.0 mm
  • Pre-felting dimensions: 23″ wide by 40″ long
  • Post-felting dimensions: 11.5″ wide by 19″ long
  • Made for: Pepper
  • Ravelry Project Page

I whipped out a new cat bed to line the bookshelf where Pepper likes to sleep.  Although she wasn’t very co-operative re: posing for the picture, she loves the bed.  It’s now her favorite sleeping spot.

image
image
image

Semi-finished Projects

These projects are “semi-finished” because I’m making multiple dishcloths from the same patterns, as part of my ongoing Dishcloth Advent Calendar (details in my 2015 Plans post) project.  I’ve finished at least one individual item, but am still working on making more.  I need to make 18 dishcloths in each pattern, and will write blog posts with all the project details when I finish all 18.

Heart Illusion Dishcloths

I finished 9 of these in May.

image
image

Bias Knit, Crochet Cotton Dishcloth

I only finished one of these.  Even with two strands held together, it took about 3 hours to knit one of these, and I didn’t even make it as big as the pattern suggests.  It’ll take me a while to make all 18 of these, but I do like them.

image
image

Activities

I participated in three demos with the Weavers of Orlando.  I’ve written blog posts about two of those: St. Johns River Festival of the Arts and Arts at Audubon Elementary.  The third demo was just this past Friday, and I’m working on writing a post about it!

I also traveled to New England to attend my cousin’s college graduation.  While there, I visited 12 yarn shops, including WEBS!  I bought yarn in all the shops, and will be writing multiple blog posts about the experience.  I needed to take pix of all the new stash for the posts and to update my Rav stash.  I’ve been working on it and I’m just about finished.  I will be posting about these shops throughout the month of June; I plan to get all the posts up no later than June 25 since several of the shops I visited are part of the 2015 I-91 Shop Hop which starts that day.